John, with digger |
Today John and Gillian arrived with a small digger. It was time to break up and remove all the concrete around one part of The Cowshed. This area was a nightmare - uneven concrete surfaces, concrete drains.... this was a chance to rectify this, level out the area, and form what will be the wheelchair access into the building.
A large deck will be built in this area, with a ramp running along side the pump room and former tack shed.
Everyone pitched in to help remove the concrete - Diane, Emma-Leigh and Sarah, along with Gillian all helped out. What will we do with the broken concrete and large mound of topsoil. Watch this space!!!
No comments:
Post a Comment